20-Squad (2024): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Infobox Apparatus | {{Infobox Apparatus | ||
| name = 20-Squad | | name = 20-Squad | ||
| image = | | image = 20-Squad (2024).jpg | ||
| caption = | | caption = | ||
| year = {{Start date and age|2024|df=y}} | | year = {{Start date and age|2024|df=y}} | ||
| Line 8: | Line 8: | ||
| previously = | | previously = | ||
| subsequently = | | subsequently = | ||
| predecessor = [[20- | | predecessor = [[20-2001 (2006)|2006 Pierce Rescue-Pumper (20-2001)]] | ||
| successor = | | successor = | ||
}} | }} | ||
| Line 21: | Line 21: | ||
| water_capacity = 750 USG | | water_capacity = 750 USG | ||
| foam_capacity = 25 USG | | foam_capacity = 25 USG | ||
| delivery_date = | | delivery_date = November 2024 | ||
| inservice_date = | | inservice_date = December 13, 2024 | ||
| dedication_date = | | dedication_date = | ||
| outservice_date = | | outservice_date = | ||
| Line 96: | Line 96: | ||
| construction_started = | | construction_started = | ||
| construction_complete = August 2024 | | construction_complete = August 2024 | ||
| delivery_date = | | delivery_date = November 2024 | ||
| purchased_from = | | purchased_from = | ||
| purchased_date = | | purchased_date = | ||
| purchased_price = | | purchased_price = | ||
}}{{Apparatus Disposition | }}{{Apparatus Disposition | ||
| inservice_date = | | inservice_date = December 13, 2024 | ||
| dedication_date = | | dedication_date = | ||
| outservice_date = | | outservice_date = | ||
| Line 114: | Line 114: | ||
{{Tallman_Apparatus_Navbox}} | {{Tallman_Apparatus_Navbox}} | ||
[[Category: | [[Category:Active Apparatus]] | ||
[[Category:2024]] | [[Category:2024]] | ||
[[Category:Pierce]] | [[Category:Pierce]] | ||
Latest revision as of 11:42, 7 December 2025
| 20-Squad | |
|---|---|
|
| |
| Overview | |
| Year | 2024 |
| Manufacturer | Pierce |
| Type | Pumper/Rescue |
| Chronology | |
| Predecessor | 2006 Pierce Rescue-Pumper (20-2001) |
| At-a-Glance | |
|---|---|
| Model | Enforcer |
| Sub Type | Rescue-Pumper/Heavy Rescue |
| Features | |
| Pump Capacity | 1500 GPM |
| Water Capacity | 750 USG |
| Foam Capacity | 25 USG |
| Notable Dates | |
| Delivery | November 2024 |
| In Service | December 13, 2024 |
General
- Apparatus Type: Pumper/Rescue
- Apparatus Sub Type: Rescue-Pumper/Heavy Rescue
- Manufacturer: Pierce
- Year: 2024
- Serial Number: 38702
- VIN: 4P1BBAGF8RA026847
Chassis/Cab
- Model: Enforcer
- Cab Material: Aluminum
- Crew Capacity: 7
- Doors: 4
- Raised Roof: Yes
- Front Bumper: Extended
- Length: 175 inches (14 ft 7 in) overall, 84 inches (7 ft 0 in) crew cab
- Tilt: Full
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins X12
- Engine Specs: 525 hp, 1695 lb-ft, Inline 6
- Transmission Make/Model: Allison 4500 EVS
- Tandem Axle: Yes
Pump & Tank
- Pump Make/Model: Pierce/Darley PUC
- Pump Capacity: 1500 GPM
- Pump Location: Midship, under crew cab
- Panel Location: Driver side midship (compartment)
- Drive Type: REPTO
- Water Capacity: 750 USG
- Foam System: Husky 12
- Foam Capacity: 25 USG
Body
- Body Type: Non walk-in
- Material: Aluminum
- Length: 284 inches (23 ft 8 in)
- Misc. Features: Roll-up compartment doors
Equipment
- Generator: Yes
- Light Tower: Yes
- Reels: 2 electric
- Winch: 20,000 lb in front bumper
Dimensions
- Overall Height: 130 inches (10 ft 10 in)
- Overall Length: 477.43 inches (39 ft 9.43 in)
- Wheelbase: 257.50 inches (21 ft 5.50 in)
Construction
- Factory: Appleton, WI
- Dealer: Firematic Supply
- Construction Complete: August 2024
- Delivery Date: November 2024
Disposition
- In Service Date: December 13, 2024
CAD Drawing:
2024 Pierce 20-Squad CAD Drawing