6-Squad (2017): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
No edit summary
No edit summary
Line 79: Line 79:
| construction_started  = February 15, 2017
| construction_started  = February 15, 2017
| construction_complete = April 20, 2017
| construction_complete = April 20, 2017
| delivery_date        = Mary 30, 2017
| delivery_date        = May 30, 2017
| purchased_from        =
| purchased_from        =
| purchased_date        =
| purchased_date        =

Revision as of 20:42, 30 May 2017

6-Squad
Overview
Year 2017
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1990 Pierce Pumper (6-1250)


General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Pierce
  • Year: 2017
  • Serial Number: 30578
  • VIN: 4P1BAAGF7HA017784
  • Color: White over Red
  • NIMS Resource Typing: Engine Type I
  • Dept. Designation: #9

Chassis/Cab

  • Model: Velocity
  • Cab Material: Aluminum
  • Crew Capacity: 7
  • Doors: 4
  • Raised Roof: 10"
  • Front Bumper: 13" extended with preconnect
  • Length: 167 inches (13 ft 11 in) overall, 70 inches (5 ft 10 in) crew cab
  • Tilt: Full
  • Misc. Features: TAK-4 front suspension • Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISX12
  • Engine Specs: 11.9 L, 500 hp, 1645 lb-ft, Inline 6
  • Transmission Make/Model: Allison 4000 EVS
  • Transmission Specs: 5-Speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CSU
  • Pump Capacity: 1500 GPM, Single stage
  • Pump Location: Midship
  • Drive Type: Driveshaft
  • Foam System: Pierce Husky 3
  • Foam Type: Class B
  • Hose Reels: 1 booster above pump

Body

  • Material: Aluminum
  • Misc. Features: Integrated Oil-Dri hopper/dispenser

Equipment

  • Generator: Harrison Hydra-Gen MAS 10 kW
  • Light Tower: Will-Burt 7.5', Vertical telescoping, 120 VAC, 920w LED, 80000 lumens
  • Reels: 2 hydraulic, 1 electrical

Construction

  • Factory: Appleton, WI
  • Dealer: Firematic Supply
  • Construction Started: February 15, 2017
  • Construction Complete: April 20, 2017
  • Delivery Date: May 30, 2017

Disposition

  • Dedication Date: September 16, 2017