6-Squad (2017)
6-Squad | |
---|---|
Overview | |
Year | 2017 |
Manufacturer | Pierce |
Type | Pumper |
Chronology | |
Predecessor | 1990 Pierce Pumper (6-1250) |
At-a-Glance | |
---|---|
Model | Velocity |
Sub Type | Rescue-Pumper |
Serial Number | 30578 |
Features | |
Pump Capacity | 1500 GPM |
Water Capacity | 500 USG |
Foam Capacity | 30 USG |
Notable Dates | |
Delivery | May 30, 2017 |
In Service | June 26, 2017 |
Dedication | September 16, 2017 |
General
- Apparatus Type: Pumper
- Apparatus Sub Type: Rescue-Pumper
- Manufacturer: Pierce
- Year: 2017
- Serial Number: 30578
- VIN: 4P1BAAGF7HA017784
- Color: White over red
- NIMS Resource Typing: Engine Type I
- Dept. Designation: #9
Chassis/Cab
- Model: Velocity
- Cab Material: Aluminum
- Crew Capacity: 7
- Doors: 4
- Raised Roof: 10"
- Front Bumper: 16" extended with preconnect
- Length: 164 inches (13 ft 8 in) overall, 70 inches (5 ft 10 in) crew cab
- Tilt: Full
- Misc. Features: TAK-4 front suspension • Onspot chains
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins ISX12
- Engine Specs: 11.9 L, 500 hp, 1645 lb-ft, Inline 6
- Transmission Make/Model: Allison 4000 EVS
- Transmission Specs: 5-Speed automatic
Pump & Tank
- Pump Make/Model: Waterous CSU
- Pump Capacity: 1500 GPM, single-stage
- Pump Location: Midship
- Drive Type: Split-shaft
- Water Capacity: 500 USG
- Foam System: Pierce Husky 3
- Foam Type: Class B
- Foam Capacity: 30 USG
- Hose Reels: 1 booster above pump
Body
- Material: Aluminum
- Length: 211 inches (17 ft 7 in) overall • 152 inches (12 ft 8 in) body • 45 inches (3 ft 9 in) pumphouse
- Misc. Features: Integrated Oil-Dri hopper/dispenser • Roll up compartment doors
Equipment
- Generator: Harrison Hydra-Gen MAS 10 kW
- Light Tower: Will-Burt 7.5', Vertical telescoping, 120 VAC, 920w LED, 80000 lumens
- Reels: 2 hydraulic, 1 electrical
Dimensions
- Overall Height: 118 inches (9 ft 10 in)
- Overall Length: 377 inches (31 ft 5 in)
- Wheelbase: 184.5 inches (15 ft 4.5 in)
Construction
- Factory: Appleton, WI
- Dealer: Firematic Supply
- Construction Started: February 15, 2017
- Construction Complete: April 20, 2017
- Delivery Date: May 30, 2017
Disposition
- In Service Date: June 26, 2017
- Dedication Date: September 16, 2017
CAD Drawing: 2017 Pierce 6-Squad CAD Drawing