6-Squad (2017): Difference between revisions
Jump to navigation
Jump to search
Other Admin (talk | contribs) No edit summary |
Other Admin (talk | contribs) No edit summary |
||
Line 62: | Line 62: | ||
}}{{Apparatus Equipment | }}{{Apparatus Equipment | ||
| generator = Harrison Hydra-Gen MAS 10 kW | | generator = Harrison Hydra-Gen MAS 10 kW | ||
| light_tower = Will-Burt | | light_tower = Will-Burt 7.5', Vertical telescoping, 120 VAC, 920w LED, 80000 lumens | ||
| reels = 2 hydraulic, 1 electrical | | reels = 2 hydraulic, 1 electrical | ||
| tool_power = | | tool_power = |
Revision as of 16:22, 3 May 2017
6-Squad | |
---|---|
Overview | |
Year | 2017 |
Manufacturer | Pierce |
Type | Pumper |
Chronology | |
Predecessor | 1990 Pierce Pumper (6-1250) |
General
- Apparatus Type: Pumper
- Apparatus Sub Type: Rescue-Pumper
- Manufacturer: Pierce
- Year: 2017
- Serial Number: 30578
- VIN: 4P1BAAGF7HA017784
- Color: White over Red
- NIMS Resource Typing: Engine Type I
- Dept. Designation: #9
Chassis/Cab
- Model: Velocity
- Cab Material: Aluminum
- Crew Capacity: 7
- Doors: 4
- Raised Roof: 10"
- Front Bumper: 13" extended with preconnect
- Length: 167 inches (13 ft 11 in) overall, 70 inches (5 ft 10 in) crew cab
- Tilt: Full
- Misc. Features: TAK-4 front suspension • Onspot chains
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins ISX12
- Engine Specs: 11.9 L, 500 hp, 1645 lb-ft, Inline 6
- Transmission Make/Model: Allison 4000 EVS
- Transmission Specs: 5-Speed automatic
Pump & Tank
- Pump Make/Model: Waterous CSU
- Pump Capacity: 1500 GPM, Single stage
- Pump Location: Midship
- Drive Type: Driveshaft
- Foam System: Pierce Husky 3
- Foam Type: Class B
- Hose Reels: 1 booster above pump
Body
- Material: Aluminum
- Misc. Features: Integrated Oil-Dri hopper/dispenser
Equipment
- Generator: Harrison Hydra-Gen MAS 10 kW
- Light Tower: Will-Burt 7.5', Vertical telescoping, 120 VAC, 920w LED, 80000 lumens
- Reels: 2 hydraulic, 1 electrical
Construction
- Factory: Appleton, WI
- Dealer: Firematic Supply
- Construction Started: February 15, 2017
- Construction Complete: April 20, 2017