20-Tanker (2014): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 31: | Line 31: | ||
| raised_roof = 16" | | raised_roof = 16" | ||
| bumper = 24" extended with preconnect | | bumper = 24" extended with preconnect | ||
| cab_length = 72" | | cab_length = 165" (72" crew cab) | ||
| tilt = Full | | tilt = Full | ||
| cab_features = | | cab_features = | ||
Line 52: | Line 52: | ||
| foam_type = | | foam_type = | ||
| foam_tank_capacity = 30 USG | | foam_tank_capacity = 30 USG | ||
| hose_reel = | | hose_reel = 1 booster above pump panel | ||
| pump_features = | | pump_features = | ||
}}{{Apparatus Body | }}{{Apparatus Body |
Revision as of 13:59, 3 April 2017
20-Tanker | |
---|---|
Overview | |
Year | 2014 |
Manufacturer | Seagrave |
Type | Pumper |
Chronology | |
Predecessor | 2006 Pierce Pumper (20-Tanker) |
General
- Apparatus Type: Pumper
- Apparatus Sub Type: Rescue-Pumper
- Manufacturer: Seagrave
- Year: 2014
- Serial Number: 78H09
- Color: Red over white over red
- NIMS Resource Typing: Engine Type I
Chassis/Cab
- Model: Marauder II TB70CS
- Cab Material: Stainless Steel
- Crew Capacity: 8
- Doors: 4
- Raised Roof: 16"
- Front Bumper: 24" extended with preconnect
- Length: 165" (72" crew cab)
- Tilt: Full
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins ISX12
- Engine Specs: 11.9 L, 500 hp, 1645 lb-ft, Inline 6
- Transmission Make/Model: Allison 4000 EVS
- Transmission Specs: 6-Speed automatic
Pump & Tank
- Pump Make/Model: Waterous CSU, Single-Stage
- Pump Capacity: 2000 GPM
- Pump Location: Midship
- Drive Type: Drivetrain
- Foam System: FoamPro
- Hose Reels: 1 booster above pump panel
Body
- Material: Stainless Steel
- Length: 238 inches (19 ft 10 in)
Equipment
- Generator: Harrison MCR, 12kW hydraulic PTO
Dimensions
- Overall Height: 124 inches (10 ft 4 in)
- Overall Length: 403 inches (33 ft 7 in)
- Wheelbase: 205 inches (17 ft 1 in)
Construction
- Factory: Clintonville, WI
- Dealer: Hudson Valley Fire Equipment, LLC
- Construction Started: April, 2014
- Construction Complete: August, 2014
- Delivery Date: October 9, 2014
Disposition
CAD Drawing: 2014 Seagrave 20-Tanker CAD Drawing