20-Tower (2020): Difference between revisions
Jump to navigation
Jump to search
Other Admin (talk | contribs) No edit summary |
No edit summary |
||
Line 107: | Line 107: | ||
| cost = <!-- $6,500 ({{Inflation|US|6500|1931|fmt=eq}}) --> | | cost = <!-- $6,500 ({{Inflation|US|6500|1931|fmt=eq}}) --> | ||
| construction_started = May 2020 | | construction_started = May 2020 | ||
| construction_complete = | | construction_complete = September 2020 | ||
| delivery_date = | | delivery_date = | ||
| purchased_from = | | purchased_from = |
Revision as of 21:59, 18 September 2020
20-Tower | |
---|---|
Overview | |
Year | 2020 |
Manufacturer | Pierce |
Type | Aerial |
Chronology | |
Predecessor | 1998 Pierce Ladder Platform (20-Tower) |
At-a-Glance | |
---|---|
Model | Arrow XT |
Sub Type | Ladder Platform |
Serial Number | 34444 |
Features | |
Aerial Height | 100' |
Water Capacity | 300 USG |
General
- Apparatus Type: Aerial
- Apparatus Sub Type: Ladder Platform
- Manufacturer: Pierce
- Year: 2020
- Serial Number: 34444
- VIN: 4P1BCAGF2LA022104
- Color: Red over white over red
Chassis/Cab
- Model: Arrow XT
- Crew Capacity: 6
- Doors: 4
- Length: 140.75 inches (11 ft 8.75 in) overall, 57 inches (4 ft 9 in) crew cab
- Tilt: Full
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins X15
- Transmission Make/Model: Allison 4500 EVS
- Transmission Specs: 5-speed automatic
- Tandem Axle: Yes
Pump & Tank
- Water Capacity: 300 USG
Aerial
- Aerial Model: Ascendant
- Mounting: Mid
- Vertical Reach: 100'
- Horizontal Reach: 93'
- Sections: 5
- Material: Steel
- Tip Load: 1,000 lb dry, 500 lb wet
- Prepiped Waterway: Yes
- Outriggers: 1 set of H-style (18' spread) & 4 down-jacks
- Features: 14.3 sq ft bucket
Body
- Material: Aluminum
- Length: 355 inches (29 ft 7 in)
- Misc. Features: Rollup compartment doors
Equipment
Dimensions
- Overall Height: 131 inches (10 ft 11 in)
- Overall Length: 495.75 inches (41 ft 3.75 in)
- Wheelbase: 252 inches (21 ft 0 in)
Construction
- Factory: Appleton, WI
- Dealer: Firematic Supply
- Construction Started: May 2020
- Construction Complete: September 2020
Disposition
CAD Drawing: 2020 Pierce 20-Tower CAD Drawing