20-Tanker (2014): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
m Text replacement - "foam_tank_capacity" to "foam_capacity"
Line 51: Line 51:
| foam_system        = FoamPro
| foam_system        = FoamPro
| foam_type          =  
| foam_type          =  
| foam_tank_capacity = 30 USG
| foam_capacity = 30 USG
| hose_reel          = 1 booster above pump panel
| hose_reel          = 1 booster above pump panel
| pump_features      =  
| pump_features      =  

Revision as of 02:34, 26 January 2018

20-Tanker
Overview
Year 2014
Manufacturer Seagrave
Type Pumper
Chronology
Predecessor 2006 Pierce Pumper (20-Tanker)


General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Seagrave
  • Year: 2014
  • Serial Number: 78H09
  • Color: Red over white over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Marauder II TB70CS
  • Cab Material: Stainless Steel
  • Crew Capacity: 8
  • Doors: 4
  • Raised Roof: 16"
  • Front Bumper: 24" extended with preconnect
  • Length: 165" (72" crew cab)
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISX12
  • Engine Specs: 11.9 L, 500 hp, 1645 lb-ft, Inline 6
  • Transmission Make/Model: Allison 4000 EVS
  • Transmission Specs: 6-Speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CSU
  • Pump Capacity: 2000 GPM, single-stage
  • Pump Location: Midship
  • Drive Type: Drivetrain
  • Foam System: FoamPro
  • Foam Capacity: 30 USG
  • Hose Reels: 1 booster above pump panel

Body

  • Material: Stainless Steel
  • Length: 238 inches (19 ft 10 in)

Equipment

  • Generator: Harrison MCR, 12kW hydraulic PTO
  • Reels: 1 electric, 1 hydraulic
  • Tool Power: Hurst JL-SE60

Dimensions

  • Overall Height: 124 inches (10 ft 4 in)
  • Overall Length: 403 inches (33 ft 7 in)
  • Wheelbase: 205 inches (17 ft 1 in)

Construction

  • Factory: Clintonville, WI
  • Dealer: Hudson Valley Fire Equipment, LLC
  • Construction Started: April, 2014
  • Construction Complete: August, 2014
  • Delivery Date: October 9, 2014

Disposition

  • In Service Date: November 4, 2014


CAD Drawing: PDF 2014 Seagrave 20-Tanker CAD Drawing