20-MP (2017): Difference between revisions
Jump to navigation
Jump to search
Other Admin (talk | contribs) No edit summary |
Other Admin (talk | contribs) No edit summary |
||
Line 52: | Line 52: | ||
| foam_type = | | foam_type = | ||
| foam_tank_capacity = | | foam_tank_capacity = | ||
| hose_reel = | | hose_reel = One booster, one forestry, above pump | ||
| pump_features = | | pump_features = | ||
}}{{Apparatus Body | }}{{Apparatus Body | ||
Line 66: | Line 66: | ||
| tool_power = | | tool_power = | ||
| compressor = | | compressor = | ||
| winch = | | winch = Warn 12,000 lb in front bumper | ||
| cascade = | | cascade = | ||
| misc_equipment = | | misc_equipment = | ||
Line 79: | Line 79: | ||
| construction_started = 2016 | | construction_started = 2016 | ||
| construction_complete = June, 2017 | | construction_complete = June, 2017 | ||
| delivery_date = | | delivery_date = July 24, 2017 (to dealer) | ||
| purchased_from = | | purchased_from = | ||
| purchased_date = | | purchased_date = |
Revision as of 20:20, 24 July 2017
20-MP | |
---|---|
Overview | |
Year | 2017 |
Manufacturer | Ford/Seagrave |
Type | Pumper |
Chronology | |
Predecessor | 1990 Ford/Pierce Mini-Pumper (20-MP) |
General
- Apparatus Type: Pumper
- Apparatus Sub Type: Mini-Pumper
- Manufacturer: Ford/Seagrave
- Year: 2016
- Serial Number: 9P092
- Color: White over red
Chassis/Cab
- Manufacturer: Ford
- Model: F-550
- Cab Material: Stainless steel
- Crew Capacity: 2
- Doors: 2
- Front Bumper: Extended
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Ford PowerStroke
- Engine Specs: 6.7 L, 440 hp, 860 lb-ft, V8
- Transmission Specs: Automatic
- Four Wheel Drive: Yes
Pump & Tank
- Pump Make/Model: Hale
- Pump Capacity: 1000 GPM
- Pump Location: Midship
- Drive Type: Drivetrain
- Hose Reels: One booster, one forestry, above pump
Body
- Manufacturer: Seagrave
- Material: Aluminum
- Misc. Features: Roll-up doors
Equipment
- Winch: Warn 12,000 lb in front bumper
Dimensions
Construction
- Factory: Rock Hill, SC
- Dealer: Hudson Valley Fire Equipment, LLC
- Construction Started: 2016
- Construction Complete: June, 2017
- Delivery Date: July 24, 2017 (to dealer)
Disposition