Construction of this station began in the 1960, with several additions and modifications over the following decades. | Construction of this station began in the 1960, with several additions and modifications over the following decades. | ||
The station houses [[6-1501 (2012)|6-1501]], [[6- | The station houses [[6-1501 (2012)|6-1501]], [[6-EQ (2003)|6-EQ]], [[6-SRV (2021)|6-SRV]], [[6-Squad (2017)|6-Squad]], and [[6-Tower (2002)|6-Tower]]. | ||
<gallery mode="packed-hover"> | <gallery mode="packed-hover"> |
Latest revision as of 15:25, 24 July 2021
6-101 was the first substation built by the Hillcrest Fire Company No. 1 to provide better protection for the northern end of the fire district.
The station is located at 16 Thiells Mt. Ivy Road in the Mount Ivy section of Haverstraw.
Construction of this station began in the 1960, with several additions and modifications over the following decades.
The station houses 6-1501, 6-EQ, 6-SRV, 6-Squad, and 6-Tower.