9-Tanker (2018): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
No edit summary
Line 22: Line 22:
| foam_capacity      = 30 USG
| foam_capacity      = 30 USG
| delivery_date      = April 25, 2019
| delivery_date      = April 25, 2019
| inservice_date    =  
| inservice_date    = June 20, 2019
| dedication_date    =  
| dedication_date    =  
| outservice_date    =  
| outservice_date    =  
Line 101: Line 101:
| purchased_price      =  
| purchased_price      =  
}}{{Apparatus Disposition
}}{{Apparatus Disposition
| inservice_date  =  
| inservice_date  = June 20, 2019
| dedication_date =  
| dedication_date =  
| outservice_date =  
| outservice_date =  
Line 115: Line 115:


[[Category:Recently Delivered]]
[[Category:Recently Delivered]]
[[Category:Active Apparatus]]
[[Category:2018]]
[[Category:2018]]
[[Category:Rosenbauer]]
[[Category:Rosenbauer]]

Revision as of 14:41, 1 July 2019

9-Tanker
Overview
Year 2018; 6 years ago (2018)
Manufacturer Rosenbauer
Type Pumper
Chronology
Predecessor 2012 Pierce Pumper (9-Tanker)


At-a-Glance
Model Commander
Sub Type Rescue-Pumper
Features
Pump Capacity 1750 GPM
Water Capacity 1000 USG
Foam Capacity 30 USG
Notable Dates
Delivery April 25, 2019
In Service June 20, 2019

General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Rosenbauer
  • Color: Red over white over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Commander
  • Doors: 4
  • Raised Roof: Yes
  • Front Bumper: Extended
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel

Pump & Tank

  • Pump Make/Model: Waterous
  • Pump Capacity: 1750 GPM
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 1000 USG
  • Foam Capacity: 30 USG

Body

  • Body Type: Aluminum
  • Misc. Features: Roll up compartment doors

Equipment

  • Generator: 10 kW

Dimensions

Construction

  • Factory: Wyoming, MN
  • Dealer: Garrison Fire & Rescue
  • Construction Complete: February 2019
  • Delivery Date: April 25, 2019

Disposition

  • In Service Date: June 20, 2019