20-MP (2017): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
m Text replacement - "| year = 2017 | manufacturer" to "| year = {{Start date and age|2017|df=y}} | manufacturer"
Line 3: Line 3:
| image          = File:20-MP_2017.jpg
| image          = File:20-MP_2017.jpg
| caption        =  
| caption        =  
| year            = 2017
| year            = {{Start date and age|2017|df=y}}
| manufacturer    = Ford/Seagrave
| manufacturer    = Ford/Seagrave
| apparatus_type  = Pumper
| apparatus_type  = Pumper

Revision as of 22:11, 24 March 2019

20-MP
Overview
Year 2017; 7 years ago (2017)
Manufacturer Ford/Seagrave
Type Pumper
Chronology
Predecessor 1990 Ford/Pierce Mini-Pumper (20-MP)


At-a-Glance
Model F-550
Sub Type Mini-Pumper
Serial Number 9P092
Features
Pump Capacity 1000 GPM
Water Capacity 300 USG
Notable Dates
Delivery July 24, 2017
In Service April 17, 2018

General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Mini-Pumper
  • Manufacturer: Ford/Seagrave
  • Year: 2016
  • Serial Number: 9P092
  • Color: White over red

Chassis/Cab

  • Manufacturer: Ford
  • Model: F-550
  • Cab Material: Stainless steel
  • Crew Capacity: 2
  • Doors: 2
  • Front Bumper: Extended

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Ford Power Stroke
  • Engine Specs: 6.7 L, 440 hp, 860 lb-ft, V8
  • Transmission Make/Model: Ford TorqShift
  • Transmission Specs: 6-speed automatic
  • Four Wheel Drive: Yes

Pump & Tank

  • Pump Make/Model: Hale MG
  • Pump Capacity: 1000 GPM
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 300 USG
  • Hose Reels: One booster, one forestry, above pump

Body

  • Manufacturer: Seagrave
  • Material: Aluminum
  • Misc. Features: Roll up compartment doors

Equipment

  • Winch: Warn M12 12,000 lb in front bumper

Dimensions

Construction

  • Factory: Rock Hill, SC
  • Dealer: Hudson Valley Fire Equipment, LLC
  • Construction Started: 2016
  • Construction Complete: June 2017
  • Delivery Date: July 24, 2017

Disposition

  • In Service Date: April 17, 2018, 22:18