3-Tanker (2012)

From Rockland Apparatus
Revision as of 22:10, 24 March 2019 by Other Admin (talk | contribs) (Text replacement - "| year = 2012 | manufacturer" to "| year = {{Start date and age|2012|df=y}} | manufacturer")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
3-Tanker
Overview
Year 2012; 12 years ago (2012)
Manufacturer Spartan/Crimson
Type Pumper
Chronology
Predecessor 1992 HME/KME Pumper (3-Tanker)


At-a-Glance
Model Metro Star LFD
Serial Number 211127
Features
Pump Capacity 1500 GPM
Water Capacity 1000 USG
Foam Capacity 20 USG
Notable Dates
Delivery September 30, 2012
In Service November 13, 2012
Dedication May 18, 2013

General

  • Apparatus Type: Pumper
  • Manufacturer: Spartan/Crimson
  • Year: 2012
  • Serial Number: 211127
  • VIN: 4S7CU2D97CC075530
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Manufacturer: Spartan
  • Model: Metro Star LFD
  • Cab Material: Aluminum
  • Crew Capacity: 8
  • Doors: 4
  • Raised Roof: 10"
  • Front Bumper: 16" extended with preconnect
  • Length: 160.5 inches (13 ft 4.5 in) overall, 67.5 inches (5 ft 7.5 in) crew cab
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISL9
  • Engine Specs: 8.9 L, 450 hp, 1250 lb-ft, Inline 6
  • Transmission Make/Model: Allison 3000 EVS
  • Transmission Specs: 5-speed automatic

Pump & Tank

  • Pump Make/Model: Hale RME
  • Pump Capacity: 1500 GPM
  • Pump Location: Rear
  • Panel Location: Driver rear (compartment)
  • Drive Type: PTO
  • Water Capacity: 1000 USG
  • Foam Capacity: 20 USG

Body

  • Manufacturer: Crimson
  • Material: Stainless steel
  • Length: 232.5 inches (19 ft 4.5 in)
  • Misc. Features: Roll up compartment doors

Equipment

  • Generator: Smart Power 10 kW

Dimensions

  • Overall Height: 114.75 inches (9 ft 6.75 in)
  • Overall Length: 398.5 inches (33 ft 2.5 in)
  • Wheelbase: 195 inches (16 ft 3 in)

Construction

  • Factory: Charlotte, MI
  • Dealer: Hendrickson Fire Rescue Equipment
  • Delivery Date: September 30, 2012

Disposition

  • In Service Date: November 13, 2012
  • Dedication Date: May 18, 2013


CAD Drawing: PDF 2012 Spartan/Crimson 3-Tanker CAD Drawing