13-Squad (2014): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
No edit summary
Line 19: Line 19:
| serial            = 27195
| serial            = 27195
| vin              = 4P1CS01A4EA014359
| vin              = 4P1CS01A4EA014359
| color            = White over Red
| color            = White over red
| nims              = Engine Type I
| nims              = Engine Type I
| designation      =  
| designation      =  

Revision as of 17:38, 31 December 2017

13-Squad
Overview
Year 2014
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1997 Pierce Pumper (13-1000)


General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Pierce
  • Year: 2014
  • Serial Number: 27195
  • VIN: 4P1CS01A4EA014359
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Saber
  • Cab Material: Aluminum
  • Crew Capacity: 8
  • Doors: 4
  • Raised Roof: 12"
  • Front Bumper: 13" extended with preconnect and winch receiver
  • Length: 135.75 inches (11 ft 3.75 in) overall, 57 inches (4 ft 9 in) crew cab
  • Tilt: Full
  • Misc. Features: Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISL9
  • Engine Specs: 8.9 L, 400 hp, 1250 lb-ft, Inline 6
  • Transmission Make/Model: Allison 3000 EVS
  • Transmission Specs: 5-Speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CM
  • Pump Capacity: 1000 GPM, two-stage
  • Pump Location: Midship
  • Drive Type: Driveshaft
  • Foam System: Pierce Husky 12
  • Foam Type: Class B

Body

  • Material: Aluminum
  • Length: 136 inches (11 ft 4 in)

Equipment

  • Generator: Harrison Hydra-Gen MCR 10 kW hydraulic
  • Reels: 2 hydraulic, 1 electrical
  • Winch: Warn 9000 lb portable with receivers at front, rear, sides

Construction

  • Factory: Bradenton, FL
  • Dealer: Firematic Supply
  • Cost: $498,441 (equivalent to $641,513 in 2023)
  • Construction Started: January 13, 2014
  • Construction Complete: March 28, 2014
  • Delivery Date: April 2014

Disposition

  • In Service Date: May 17, 2014
  • Dedication Date: September 27, 2014