8-75 (2017): Difference between revisions
Jump to navigation
Jump to search
Other Admin (talk | contribs) m Text replacement - "| year = 2017 | manufacturer" to "| year = {{Start date and age|2017|df=y}} | manufacturer" |
No edit summary |
||
Line 133: | Line 133: | ||
[[Category:Active Apparatus]] | [[Category:Active Apparatus]] | ||
[[Category:2017]] | [[Category:2017]] | ||
[[Category:E-One]] | [[Category:E-One]] |
Revision as of 11:39, 26 April 2019
8-75 | |
---|---|
Overview | |
Year | 2017 |
Manufacturer | E-One |
Type | Aerial |
Chronology | |
Predecessor | 1991 Simon-Duplex/RD Murray Pumper (8-1501) |
At-a-Glance | |
---|---|
Model | Cyclone |
Sub Type | Ladder |
Serial Number | 140994 |
Features | |
Aerial Height | 78' |
Pump Capacity | 1500 GPM |
Water Capacity | 500 USG |
Notable Dates | |
Delivery | January 10, 2018 |
In Service | April 16, 2018 |
Dedication | June 9, 2018 |
General
- Apparatus Type: Aerial
- Apparatus Sub Type: Ladder
- Manufacturer: E-One
- Year: 2017
- Serial Number: 140994
- VIN: 4ENLAAA80H1000994
- Color: White over red
- NIMS Resource Typing: Aerial Type I
Chassis/Cab
- Model: Cyclone
- Cab Material: Aluminum
- Crew Capacity: 6
- Doors: 4
- Raised Roof: 12" notched
- Front Bumper: Extended with preconnect
- Tilt: Full
Drivetrain
- Propulsion: Diesel
- Engine Make/Model: Cummins ISX
Pump & Tank
- Pump Make/Model: Hale Qmax150-23S
- Pump Capacity: 1500 GPM, single-stage
- Pump Location: Midship
- Drive Type: Split-shaft
- Water Capacity: 500 USG
Aerial
- Aerial Model: HP78
- Mounting: Rear
- Vertical Reach: 78'
- Sections: 3
- Material: Aluminum
- Tip Load: 750 lbs dry, 500 lbs wet
- Prepiped Waterway: Yes
- Outriggers: Rear, H-Style, 16' spread
Body
- Manufacturer: Aluminum
- Misc. Features: Roll up compartment doors
Equipment
- Generator: Yes
- Reels: 1 electric (rear), 1 electric to ladder tip
Dimensions
- Overall Length: 445 inches (37 ft 1 in)
- Wheelbase: 220 inches (18 ft 4 in)
Construction
- Factory: Ocala, FL
- Dealer: Nichols Fire Apparatus/Premier Fire Apparatus (Premier acquired Nichols in early 2017)
- Construction Started: August 2017
- Construction Complete: November 2017
- Delivery Date: January 10, 2018
Disposition
- In Service Date: April 16, 2018, 22:02
- Dedication Date: June 9, 2018