23-Rescue (2021): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
No edit summary
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox Apparatus
{{Infobox Apparatus
| name            = 23-Rescue
| name            = 23-Rescue
| image          =  
| image          = 23-Rescue_2021.jpg
| caption        =  
| caption        =  
| year            = {{Start date and age|2020|df=y}}
| year            = {{Start date and age|2021|df=y}}
| manufacturer    = KME
| manufacturer    = KME
| apparatus_type  = Rescue
| apparatus_type  = Rescue
| previously      =  
| previously      =  
| subsequently    =  
| subsequently    =  
| predecessor    = [[23-Rescue (1992)|1992 Ford/Saulsbury Heavy Rescue (23-Rescue)]]
| predecessor    = [[23-Rescue (1991)|1991 Ford/Saulsbury Heavy Rescue (23-Rescue)]]
| successor      =  
| successor      =  
}}
}}
Line 21: Line 21:
| water_capacity    =  
| water_capacity    =  
| foam_capacity      =  
| foam_capacity      =  
| delivery_date      =  
| delivery_date      = May 19, 2022
| inservice_date    =  
| inservice_date    = June 7, 2022
| dedication_date    =  
| dedication_date    =  
| outservice_date    =  
| outservice_date    =  
Line 31: Line 31:
| apparatus_subtype = Heavy Rescue
| apparatus_subtype = Heavy Rescue
| manufacturer      = KME
| manufacturer      = KME
| year              = 2020
| year              = 2021
| serial            = GSO-11363
| serial            = GSO-11363
| vin              =  
| vin              =  
Line 81: Line 81:
| factory              = Nesquehoning, PA
| factory              = Nesquehoning, PA
| dealer                = Bulldog Fire Apparatus
| dealer                = Bulldog Fire Apparatus
| cost                  = $833,094 ({{Inflation|US|833094|2020|fmt=eq}})
| cost                  = $833,094 ({{Inflation|US|833094|2021|fmt=eq}})
| construction_started  =  
| construction_started  = August 2021
| construction_complete =  
| construction_complete = March 2022
| delivery_date        =  
| delivery_date        = May 19, 2022
| purchased_from        =  
| purchased_from        =  
| purchased_date        =  
| purchased_date        =  
| purchased_price      =  
| purchased_price      =  
}}{{Apparatus Disposition
}}{{Apparatus Disposition
| inservice_date  =  
| inservice_date  = June 7, 2022
| dedication_date =  
| dedication_date =  
| outservice_date =  
| outservice_date =  
Line 100: Line 100:
{{West_Haverstraw_Volunteer_Hose_Apparatus_Navbox}}
{{West_Haverstraw_Volunteer_Hose_Apparatus_Navbox}}


[[Category:In Production]]
[[Category:Active Apparatus]]
[[Category:2020]]
[[Category:2021]]
[[Category:KME]]
[[Category:KME]]
[[Category:Rescue]]
[[Category:Rescue]]

Latest revision as of 21:11, 20 April 2023

23-Rescue
Overview
Year 2021; 3 years ago (2021)
Manufacturer KME
Type Rescue
Chronology
Predecessor 1991 Ford/Saulsbury Heavy Rescue (23-Rescue)


At-a-Glance
Sub Type Heavy Rescue
Serial Number GSO-11363
Notable Dates
Delivery May 19, 2022
In Service June 7, 2022

General

  • Apparatus Type: Rescue
  • Apparatus Sub Type: Heavy Rescue
  • Manufacturer: KME
  • Year: 2021
  • Serial Number: GSO-11363
  • Color: White over blue

Chassis/Cab

  • Cab Material: Aluminum
  • Crew Capacity: 10
  • Doors: 2
  • Front Bumper: 7" extended
  • Misc. Features: Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins L9
  • Engine Specs: 9 L, 450 hp, 1250 lb-ft, Inline 6
  • Transmission Make/Model: Allison 3000 EVS
  • Transmission Specs: 5-speed automatic

Body

  • Body Type: Walk-In, rear access
  • Material: Aluminum

Equipment

  • Generator: Onan 20kW PTO
  • Light Tower: Yes
  • Reels: 2 electric
  • Winch: Warn XD9000i portable, 9000 lb

Dimensions

  • Overall Height: 126 inches (10 ft 6 in)
  • Overall Length: 364 inches (30 ft 4 in)
  • Wheelbase: 164 inches (13 ft 8 in)

Construction

  • Factory: Nesquehoning, PA
  • Dealer: Bulldog Fire Apparatus
  • Cost: $833,094 (equivalent to $936,732 in 2023)
  • Construction Started: August 2021
  • Construction Complete: March 2022
  • Delivery Date: May 19, 2022

Disposition

  • In Service Date: June 7, 2022