25-1750 (1997): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
No edit summary
 
Line 107: Line 107:
| misc_history    =  
| misc_history    =  
}}
}}
<youtube>nAZrd1TlB4A</youtube>


{{South_Spring_Valley_Apparatus_Navbox}}
{{South_Spring_Valley_Apparatus_Navbox}}
Line 119: Line 121:
[[Category:Tyler Fire Equipment]]
[[Category:Tyler Fire Equipment]]
[[Category:South Spring Valley FD]]
[[Category:South Spring Valley FD]]
[[Category:YouTube]]

Latest revision as of 02:11, 26 April 2019

25-1750
Overview
Year 1997; 27 years ago (1997)
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1976 Mack Pumper (25-1000)


At-a-Glance
Model Lance II
Sub Type Rescue-Pumper
Serial Number EA524
Features
Pump Capacity 1750 GPM
Water Capacity 1000 USG
Foam Capacity 50 USG

General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Pierce
  • Year: 1997
  • Serial Number: EA524
  • VIN: 4P1CT02S1VA000391
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Lance II
  • Cab Material: Aluminum
  • Doors: 4
  • Raised Roof: 22"
  • Length: 87 inches (7 ft 3 in) crew cab
  • Tilt: Split
  • Misc. Features: Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Detroit Diesel Series 60
  • Engine Specs: 12.7 L, 430 hp, 1450 lb-ft, Inline 6
  • Transmission Make/Model: Allison HD4060PR
  • Transmission Specs: 5-speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CMU
  • Pump Capacity: 1750 GPM, two-stage
  • Pump Location: Midship
  • Panel Location: Top
  • Drive Type: Split-shaft
  • Water Capacity: 1000 USG
  • Foam System: Akron 3096, 95 GPM, 0-6%
  • Foam Capacity: 50 USG

Body

  • Material: Aluminum

Equipment

  • Generator: Yes
  • Light Tower: Will-Burt Nightscan 15', horizontal articulating, 240 VAC, 4000w halogen
  • Reels: 1 electric

Dimensions

Construction

  • Factory: Appleton, WI
  • Dealer: Tyler Fire Equipment
  • Construction Complete: May 1997

Disposition