20-Tower (2020): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
No edit summary
No edit summary
 
(12 intermediate revisions by 2 users not shown)
Line 18: Line 18:
| cost              =  
| cost              =  
| aerial_vertical    = 100'
| aerial_vertical    = 100'
| pump_capacity      =  
| pump_capacity      = 2000 GPM
| water_capacity    = 300 USG
| water_capacity    = 300 USG
| foam_capacity      =  
| foam_capacity      =  
| delivery_date      =  
| delivery_date      = November 5, 2020
| inservice_date    =  
| inservice_date    = March 1, 2021
| dedication_date    =  
| dedication_date    =  
| outservice_date    =  
| outservice_date    =  
Line 41: Line 41:
| model                = Arrow XT
| model                = Arrow XT
| cab_type            =  
| cab_type            =  
| cab_material        =  
| cab_material        = Aluminum
| crew                = 6
| crew                = 6
| doors                = 4
| doors                = 4
| raised_roof          =  
| raised_roof          =  
| bumper              =  
| bumper              =  
| cab_length          = {{convert|140.75|in|ftin}} overall, {{convert|57|in|ftin}} crew cab
| cab_length          = {{convert|150.75|in|ftin}} overall, {{convert|67|in|ftin}} crew cab
| tilt                = Full
| tilt                = Full
| cab_features        =  
| cab_features        =  
Line 52: Line 52:
| propulsion        = Diesel
| propulsion        = Diesel
| engine            = Cummins X15
| engine            = Cummins X15
| engine_specs      =  
| engine_specs      = 14.9 L, 600 hp, 1850 lb-ft, Inline 6
| transmission      = Allison 4500 EVS
| transmission      = Allison 4500 EVS
| transmission_specs = 5-speed automatic
| transmission_specs = 5-speed automatic
Line 58: Line 58:
| 4wd                =  
| 4wd                =  
}}{{Apparatus Pump
}}{{Apparatus Pump
| pump              =  
| pump              = Waterous CSU
| pump_capacity      =  
| pump_capacity      = 2000 GPM, single-stage
| pump_location      =  
| pump_location      = Midship
| pump_panel        =  
| pump_panel        =  
| pump_drive        =  
| pump_drive        = Split-shaft
| water_capacity    = 300 USG
| water_capacity    = 300 USG
| foam_system        =  
| foam_system        =  
Line 98: Line 98:
}}{{Apparatus Dimensions
}}{{Apparatus Dimensions
| overall_height = {{convert|131|in|ftin}}
| overall_height = {{convert|131|in|ftin}}
| overall_length = {{convert|495.75|in|ftin}}
| overall_length = {{convert|507.75|in|ftin}}
| wheelbase      = {{convert|252|in|ftin}}
| wheelbase      = {{convert|262|in|ftin}}
| beam          = <!-- {{convert|###|in|ftin}} -->
| beam          = <!-- {{convert|###|in|ftin}} -->
| draft          = <!-- {{convert|###|in|ftin}} -->
| draft          = <!-- {{convert|###|in|ftin}} -->
Line 108: Line 108:
| construction_started  = May 2020
| construction_started  = May 2020
| construction_complete = September 2020
| construction_complete = September 2020
| delivery_date        =  
| delivery_date        = November 5, 2020
| purchased_from        =  
| purchased_from        =  
| purchased_date        =  
| purchased_date        =  
| purchased_price      =  
| purchased_price      =  
}}{{Apparatus Disposition
}}{{Apparatus Disposition
| inservice_date  =  
| inservice_date  = March 1, 2021
| dedication_date =  
| dedication_date =  
| outservice_date =  
| outservice_date =  
Line 122: Line 122:
}}
}}
'''CAD Drawing: [[File:PDF.png|link=|PDF]]''' [[Media:20-Tower_2020_CAD.pdf|2020 Pierce 20-Tower CAD Drawing]]
'''CAD Drawing: [[File:PDF.png|link=|PDF]]''' [[Media:20-Tower_2020_CAD.pdf|2020 Pierce 20-Tower CAD Drawing]]
'''Spec Sheet: [[File:PDF.png|link=|PDF]]''' [[Media:20-Tower_2020_Specs.pdf|2020 Pierce 20-Tower Spec Sheet]]




{{Tallman_Apparatus_Navbox}}
{{Tallman_Apparatus_Navbox}}


[[Category:In Production]]
[[Category:Active Apparatus]]
[[Category:2020]]
[[Category:2020]]
[[Category:Pierce]]
[[Category:Pierce]]
[[Category:Pierce Arrow XT]]
[[Category:Pierce Arrow XT]]
[[Category:Pierce Arrow (Series)]]
[[Category:Pierce Arrow (Series)]]
[[Category:Pierce Ascendant]]
[[Category:Aerial]]
[[Category:Aerial]]
[[Category:Ladder Platform]]
[[Category:Ladder Platform]]
[[Category:Firematic Supply]]
[[Category:Firematic Supply]]
[[Category:Tallman FD]]
[[Category:Tallman FD]]

Latest revision as of 23:38, 6 May 2022

20-Tower
Overview
Year 2020; 4 years ago (2020)
Manufacturer Pierce
Type Aerial
Chronology
Predecessor 1998 Pierce Ladder Platform (20-Tower)


At-a-Glance
Model Arrow XT
Sub Type Ladder Platform
Serial Number 34444
Features
Aerial Height 100'
Pump Capacity 2000 GPM
Water Capacity 300 USG
Notable Dates
Delivery November 5, 2020
In Service March 1, 2021

General

  • Apparatus Type: Aerial
  • Apparatus Sub Type: Ladder Platform
  • Manufacturer: Pierce
  • Year: 2020
  • Serial Number: 34444
  • VIN: 4P1BCAGF2LA022104
  • Color: Red over white over red

Chassis/Cab

  • Model: Arrow XT
  • Cab Material: Aluminum
  • Crew Capacity: 6
  • Doors: 4
  • Length: 150.75 inches (12 ft 6.75 in) overall, 67 inches (5 ft 7 in) crew cab
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins X15
  • Engine Specs: 14.9 L, 600 hp, 1850 lb-ft, Inline 6
  • Transmission Make/Model: Allison 4500 EVS
  • Transmission Specs: 5-speed automatic
  • Tandem Axle: Yes

Pump & Tank

  • Pump Make/Model: Waterous CSU
  • Pump Capacity: 2000 GPM, single-stage
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 300 USG

Aerial

  • Aerial Model: Ascendant
  • Mounting: Mid
  • Vertical Reach: 100'
  • Horizontal Reach: 93'
  • Sections: 5
  • Material: Steel
  • Tip Load: 1,000 lb dry, 500 lb wet
  • Prepiped Waterway: Yes
  • Outriggers: 1 set of H-style (18' spread) & 4 down-jacks
  • Features: 14.3 sq ft bucket

Body

  • Material: Aluminum
  • Length: 355 inches (29 ft 7 in)
  • Misc. Features: Rollup compartment doors

Equipment

Dimensions

  • Overall Height: 131 inches (10 ft 11 in)
  • Overall Length: 507.75 inches (42 ft 3.75 in)
  • Wheelbase: 262 inches (21 ft 10 in)

Construction

  • Factory: Appleton, WI
  • Dealer: Firematic Supply
  • Construction Started: May 2020
  • Construction Complete: September 2020
  • Delivery Date: November 5, 2020

Disposition

  • In Service Date: March 1, 2021


CAD Drawing: PDF 2020 Pierce 20-Tower CAD Drawing

Spec Sheet: PDF 2020 Pierce 20-Tower Spec Sheet