1-2001 (1998): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
No edit summary
Line 102: Line 102:
| inservice_date  =  
| inservice_date  =  
| dedication_date =  
| dedication_date =  
| outservice_date =  
| outservice_date = November 27, 2024
| purchaser      =  
| purchaser      =  
| sale_date      =  
| sale_date      =  
Line 111: Line 111:
{{Blauvelt_Apparatus_Navbox}}
{{Blauvelt_Apparatus_Navbox}}


[[Category:Active Apparatus]]
[[Category:Recently Retired]]
[[Category:Retired Apparatus]]
[[Category:1998]]
[[Category:1998]]
[[Category:Pierce]]
[[Category:Pierce]]

Revision as of 12:14, 28 November 2024

1-2001
Overview
Year 1998; 26 years ago (1998)
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1970 Maxim Pumper (1-1001/1-1500)
Successor 2022 Pierce Pumper (1-2000)


At-a-Glance
Model Dash 2000
Serial Number EB873
Features
Pump Capacity 2000 GPM
Water Capacity 750 USG

General

  • Apparatus Type: Pumper
  • Manufacturer: Pierce
  • Year: 1998
  • Serial Number: EB873
  • VIN: 4P1CT02S0XA000884
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Dash 2000
  • Cab Material: Aluminum
  • Doors: 4
  • Raised Roof: 10"
  • Front Bumper: Extended
  • Length: 67 inches (5 ft 7 in) crew cab
  • Tilt: Full
  • Misc. Features: Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Detroit Diesel Series 60
  • Engine Specs: 12.7 L, 430 hp, 1550 lb-ft, Inline 6
  • Transmission Make/Model: Allison HD4060PR
  • Transmission Specs: 5-speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CSU
  • Pump Capacity: 2000 GPM, single-stage
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 750 USG

Body

  • Material: Aluminum
  • Misc. Features: Roll up compartment doors

Equipment

  • Generator: Onan HDKAL 7.5 kW diesel
  • Reels: 1 electric

Construction

  • Factory: Appleton, WI
  • Dealer: Tyler Fire Equipment
  • Construction Complete: October 1998