2-Tanker (1995): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
m Text replacement - "-Speed" to "-speed"
Line 54: Line 54:
| engine_specs      = 12.7 L, 430 hp, 1450 lb-ft, Inline 6
| engine_specs      = 12.7 L, 430 hp, 1450 lb-ft, Inline 6
| transmission      = Allison HD4060PR
| transmission      = Allison HD4060PR
| transmission_specs = 5-Speed automatic
| transmission_specs = 5-speed automatic
| tandem_axle        =  
| tandem_axle        =  
| 4wd                =  
| 4wd                =  

Revision as of 23:58, 26 February 2018

2-Tanker
Overview
Year 1995
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1975 Maxim Engine (2-1500)


At-a-Glance
Model Lance II
Serial Number E8946
Cost $350,000
Features
Pump Capacity 2000 GPM
Water Capacity 1000 USG
Notable Dates
Delivery April 1995

General

  • Apparatus Type: Pumper
  • Manufacturer: Pierce
  • Year: 1995
  • Serial Number: E8949
  • VIN: 4P1CT02S3SA000324
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Lance II
  • Cab Material: Aluminum
  • Crew Capacity: 10
  • Doors: 4
  • Raised Roof: 12"
  • Front Bumper: Extended with front intake and preconnect
  • Length: 94 inches (7 ft 10 in) crew cab
  • Tilt: Split

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Detroit Diesel Series 60
  • Engine Specs: 12.7 L, 430 hp, 1450 lb-ft, Inline 6
  • Transmission Make/Model: Allison HD4060PR
  • Transmission Specs: 5-speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CMU
  • Pump Capacity: 2000 GPM, two-stage
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 1000 USG
  • Foam Capacity: 40 USG

Body

  • Material: Stainless steel

Equipment

  • Generator: Onan 6DJB 6kW diesel

Dimensions

  • Overall Length: 367 inches (30 ft 7 in)

Construction

  • Factory: Appleton, WI
  • Dealer: Tyler Fire Equipment
  • Cost: $350,000 (equivalent to $699,847 in 2023)
  • Construction Complete: March 1995
  • Delivery Date: April 1995