19-99 (2010): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
Other Admin (talk | contribs)
No edit summary
Other Admin (talk | contribs)
m Text replacement - "-Speed" to "-speed"
Line 39: Line 39:
| engine_specs      = 10.8 L, 500 hp, Inline 6
| engine_specs      = 10.8 L, 500 hp, Inline 6
| transmission      = Allison 4000 EVS
| transmission      = Allison 4000 EVS
| transmission_specs = 5-Speed automatic
| transmission_specs = 5-speed automatic
| tandem_axle        =  
| tandem_axle        =  
| 4wd                =  
| 4wd                =  

Revision as of 23:58, 26 February 2018

19-99
Overview
Year 2010
Manufacturer Seagrave
Type Aerial
Chronology
Predecessor 1973 Seagrave Tractor Drawn Ladder (19-99)


General

  • Apparatus Type: Aerial
  • Apparatus Sub Type: Tractor Drawn Ladder
  • Manufacturer: Seagrave
  • Year: 2010
  • Serial Number: 76398
  • VIN: 1F9FU38TXACST2056
  • Color: White
  • NIMS Resource Typing: Aerial Type II

Chassis/Cab

  • Cab Type: Marauder II TT06CM
  • Crew Capacity: 8
  • Doors: 4
  • Raised Roof: 8"
  • Front Bumper: 18" extended
  • Length: 158 inches (13 ft 2 in) overall, 72 inches (6 ft 0 in) crew cab
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISM
  • Engine Specs: 10.8 L, 500 hp, Inline 6
  • Transmission Make/Model: Allison 4000 EVS
  • Transmission Specs: 5-speed automatic

Aerial

  • Vertical Reach: 100'
  • Sections: 4
  • Tip Load: 250 lb
  • Prepiped Waterway: Yes
  • Outriggers: A-Style

Body

  • Material: Stainless steel

Equipment

  • Generator: Harrison MAS 10kW, Hydraulic PTO
  • Reels: 3 electric

Dimensions

  • Overall Height: 132.5 inches (11 ft 0.5 in)
  • Overall Length: 696.5 inches (58 ft 0.5 in)
  • Wheelbase: 165 inches (13 ft 9 in)

Construction

  • Factory: Clintonville, WI
  • Cost: $957,544 (equivalent to $1,296,934 in 2023)
  • Delivery Date: January 14, 2011

Disposition

  • In Service Date: February 10, 2011
  • Dedication Date: June 11, 2011
  • Misc. History: Bond of $960,000 approved at October 20, 2009 board meeting, contract signed December 16, 2009


CAD Drawing: PDF 2010 Seagrave 19-99 CAD Drawing